A new pumping station generator foundation slab was constructed within an operational site. The pumping station slab measured 11.7m3 and was constructed using reinforced concrete. 20m of ducting was installed between the generator base slab and the pumping station and once complete the concrete hardstanding was re-instated. In addition, two access staircases were created measuring 4m2 each.